Sakonnet River Bridge FEIS Report

Portsmouth & Tiverton, Rhode Island

 

On April 25, 2003, the Final Environmental Impact Statement (FEIS) was released to the public.   Follow the links below to view the sections of the report.

Adobe Acrobat Reader (version 4.0 or higher) is required to view the report.

Click here   to get the latest version of Adobe Acrobat Reader.

Note:  "Right-clicking" and selecting "Save target as" will save the file to your computer for later viewing to avoid having to download the files each time.

Volume I

Volume IIa: Correspondences and Comments

Volume IIb: Phase 1(c) Archaeological, Marine Intensive Remote Sensing Survey, Supplemental Phase II - Historical and Archaeological Resources, Consensus Determination of Eligibility

Volume IIc: Sakonnet River Bridge Circulation Study, Aquidneck Island Passenger Rail / Bicycle (Executive Summary Only), Draft Arsenic Background Evaluation, Initial Site Assessment, Power Line Relocation Study

 

 

Commonwealth Engineers & Consultants, Inc.

Phone: (401) 273-6600

Fax: (401) 273-6674

400 Smith Street

Providence, Rhode Island 02908

Copyright © 2005 Commonwealth Engineers & Consultants, Inc.
Last modified: