Sakonnet River Bridge DEIS Report

Portsmouth & Tiverton, Rhode Island

 

On July 13, 2001 the Draft Environmental Impact Statement (DEIS) was released to the public.   Follow the links below to view the sections of the report.

Adobe Acrobat Reader (version 4.0 or higher) is required to view the report.

Click here   to get the latest version of Adobe Acrobat Reader.

Note:  "Right-clicking" and selecting "Save target as" will save the file to your computer for later viewing to avoid having to download the files each time.

Volume I (Executive Summary, Draft EIS Report & Section 4(f) Statement, Volume I Appendices)

 

Volume IIa

 

Volume IIb (Air Quality Study, Marine / Navigation Study, Fish Resources Study, Hydrodynamic and Sediment Transport Modeling, Initial Site Assessment, Draft Preliminary Site Investigation Report)

Volume IIc (Historic and Architectural Resources Intensive Study)

 

 

Commonwealth Engineers & Consultants, Inc.

Phone: (401) 273-6600

Fax: (401) 273-6674

400 Smith Street

Providence, Rhode Island 02908

Copyright © 2005 Commonwealth Engineers & Consultants, Inc.
Last modified: September 27, 2006