Project Description: Commonwealth Engineers & Consultants, Inc. was retained to design and prepare contract drawings, specifications and estimates for various elements pertaining to the AMTRAK Northeast Electrification Project throughout the states of Connecticut, Rhode Island and Massachusetts. The design tasks include:
The foundation and portals supporting the electrification catenary system at the Boston South Station were designed for the freezing and thawing loads and movements resulting from the artificial ground freezing of the Central Artery Tunnel construction. The gantry support system at the New London substation consisted of drilled shaft design within the restrictive constraints of the sight, including right-of-way and excessively steep railroad embankment. |
Commonwealth Engineers & Consultants, Inc. responsibilities also included construction inspection and/or consultation during construction throughout various locations. | |
|
||
|
Drilled shaft support system - New London Gantry |
||
|
|
||
|
CE&C Home Page | Bridge / Structural Engineering | Transportation / Highway Engineering | Site Development / Civil Engineering | Environmental Permitting | Projects | Comments | Directory of Links | Search |
|
|
Commonwealth Engineers & Consultants, Inc. |
|
|
|
Send mail to Commonwe@Commonwealth-Eng.com
with
questions or comments about this web site. Copyright © 2000 Commonwealth Engineers & Consultants, Inc. Last modified: September 27, 2006 |