KEY DESIGN ELEMENT: |
|
Reconstruction Design Improvements |
||
| CLIENT: | ||
| Rhode Island Department of Transportation | ||
| Two Capitol Hill | ||
| Providence, Rhode Island | ||
| CONSTRUCTION COST: | ||
| $7.3 Million | ||
| CONSTRUCTION DATE: | ||
| 1998-2000 | ||
|
|
||
|
Project Description: Commonwealth Engineers & Consultants, Inc. developed reconstruction Improvement plans for 1.1 miles of principal arterial roadway. The project is located within the commercial zone of Smithfield and includes turning lanes, as well as the reconstruction of R.I. Route 5. In addition, geometric roadway design, drainage, utilities, retaining walls and intersection signal improvements were designed. The project also included extensive environmental coordination resulting in permits from the Rhode Island Department of Environmental Management and the U.S. Army Corps of Engineers. A significant challenge of this project was to keep traffic flowing through the construction zone during the replacement of all utility poles, the installation of the new drainage system, new 12-inch and 16-inch water mains and fiberoptic communication duct banks. This project is the first of three contracts for the reconstruction of 8.5 miles of U.S. Route 44. |
|
|
|
|
||
|
CE&C Home Page | Bridge / Structural Engineering | Transportation / Highway Engineering | Site Development / Civil Engineering | Environmental Permitting | Projects | Comments | Directory of Links | Search |
|
|
Commonwealth Engineers & Consultants, Inc. |
|
|
|
Send mail to Commonwe@Commonwealth-Eng.com
with
questions or comments about this web site. Copyright © 2000 Commonwealth Engineers & Consultants, Inc. Last modified: September 27, 2006 |